说明

FairWind 承接了 22 台 Siemens Gamesa 设备的安装工作。
6.6-170 T165 turbines, each with eight tower sections, at the Niinimäki wind farm in Finland.

This included the pre-assembly to final installation of the wind turbines, within a timeframe of six months. The project took place in two shift operations for installation and one shift for internal finishing.

 

成果

  • 高效执行预组装和安装过程
  • 在整个项目中保持安全和质量标准
  • 在预定时间内成功完成了第一阶段的安装工作。
 