Description

FairWind took on the Installation of 22 Siemens Gamesa
6.6-170 T165 turbines, each with eight tower sections, at the Niinimäki wind farm in Finland.

This included the pre-assembly to final installation of the wind turbines, within a timeframe of six months. The project took place in two shift operations for installation and one shift for internal finishing.

 

Results

  • Efficient execution of the pre-assembly and installation process
  • Maintained safety and quality standards throughout the project
  • Successfully completed phase one of the installation within the scheduled timeframe.
 

Read more here or contact us for service type.

More case studies

Large-scale turbine installation and blade repair for wind farm in Mexico
main assembly, section upending
Successful installation and crane services in challenging conditions
Chile’s largest wind farm project