Description

The project involved the complete decommissioning of 19 turbines, including all associated components, along with the dismantling and removal of 24 turbine foundations. This process was conducted with a strong focus on waste management and disposal to ensure environmental responsibility.

Results

  • Reduced risk and streamlined execution
  • Zero incidents
  • On-time and on-budget delivery
  • Single contracting interface
  • Cost efficiency
  • Optimised recycling and sustainability
     
    Read more here or contact us for decommissioning services.

More case studies

FairWind team installing a Siemens Gamesa wind turbine at the Niinimäki wind farm in Finland
Onshore installation of 22 SG turbines
FairWind technicians performing offshore wind turbine blade repair as part of a renewable energy maintenance operation
Offshore structural blade repair
Wind turbine operations at the Silver Star Wind Farm in North America, supported by FairWind
Maintenance and overhaul of Avanti lift systems