The Borssele TPs project involved the
electrical installation of 59 TPs for the
Borssele 1+2 offshore wind farm. These
TPs were assembled in Aalborg, Denmark
and installed offshore in the Dutch Sea.

The electrical work included the full
installation for integration into the
wind farm’s electrical grid, including
mounting circuit breakers, the installation
and wiring of lighting systems, cabling
throughout each TP, installing high
voltage switchgear units with liquid air
for insulation and all other electrical
components.
 