Successful installation and crane services in challenging conditions

Demonstrating that FairWind is fully equipped to tackle any challenge

说明

The project involved full onshore turbine installation, from component unloading and tower foundation setup to complete erection using FairWind’s cranes. Mechanical and electrical works ensured full operational compliance, while effective logistics and site coordination helped to maintain schedule and adhere to safety standards.

Challenges
  • Visa logistics for Brazilian team members

  • Extreme heat and wildfire risks causing work stoppages

  • Adjusted schedules for electrical storms through dynamic shift planning

  • Conducted night-time crane relocations to avoid delivery delays

成果
  •  Zero accidents or major incidents

  • All logistics and installations completed
    on time

  • Turbines handed over within schedule

  • Positive client feedback and satisfaction

Testimonial

“The work carried out has been excellent. Deadlines met, high safety standards maintained, and a high-quality service provided. It has been an honour to have such a team working on the project.” – Nordex Site Manager

更多信息 这里联系我们 为服务类型。

更多信息 案例研究

Chile’s largest wind farm project
High-quality rope access blade repair in Norway’s rugged terrain
Rotor on stand with banana beam at a North American wind farm for an MCE wind turbine replacement project
Replacing main bearings in storm season