Installing wind power against the Nordic Winter
Installation of 22 6.6-170 SG turbines
Description
FairWind took on the Installation of 22 Siemens Gamesa
6.6-170 T165 turbines, each with eight tower sections, at the Niinimäki wind farm in Finland.
This included the pre-assembly to final installation of the wind turbines, within a timeframe of six months. The project took place in two shift operations for installation and one shift for internal finishing.
Results
- Efficient execution of the pre-assembly and installation process
- Maintained safety and quality standards throughout the project
- Successfully completed phase one of the installation within the scheduled timeframe.