Description

FairWind took on the Installation of 22 Siemens Gamesa
6.6-170 T165 turbines, each with eight tower sections, at the Niinimäki wind farm in Finland.

This included the pre-assembly to final installation of the wind turbines, within a timeframe of six months. The project took place in two shift operations for installation and one shift for internal finishing.

 

Results

  • Efficient execution of the pre-assembly and installation process
  • Maintained safety and quality standards throughout the project
  • Successfully completed phase one of the installation within the scheduled timeframe.
 

Read more here or contact us for service type.

More case studies

Rotor on stand with banana beam at a North American wind farm for an MCE wind turbine replacement project
Replacing main bearings in storm season
FairWind technicians performing offshore wind turbine blade repair as part of a renewable energy maintenance operation
Offshore structural blade repair
Wind turbine operations at the Silver Star Wind Farm in North America, supported by FairWind
Maintenance and overhaul of Avanti lift systems
en_GBEN