Description

FairWind was appointed to carry out a structural blade repair on an offshore wind turbine, using rope access techniques to restore the integrity of a 1.8-meter-long crack in the blade.

An extensive inspection was conducted to identify damage and moisture issues on the blade’s external surface. FairWind then swiftly repaired the structural damage with minimal disruption to the turbine’s power production, ensuring efficient restoration. 

Results

  • Restored blade integrity with minimal downtime
  • Adherence to strict safety and environmental standards
  • Cost reduction through a full-service approach
  • Increased efficiency through streamlined supplier management
 
Leia mais aqui. or contact us for blade repair.

More case studies

Instalação de aerogeradores em larga escala e reparo de pás para parque eólico no México
main assembly, section upending
Sucesso na instalação e nos serviços de guindaste em condições desafiadoras
O maior projeto de parque eólico do Chile