Descripción

FairWind’s Main Component Exchange (MCE) team successfully completed a main bearing replacement on a wind turbine in the United States.

This comprehensive project involved the full disassembly of the existing drivetrain, including the removal of the hub and blades.

Resultados
  • Despite weather challenges, the project was delivered on schedule.

  • The turbine was reassembled and tested within the allotted time frame.

  • The main bearing replacement extended the turbine’s life, reducing the need for new equipment production and transportation, and minimising environmental impact.

  • Coordinated efforts between crane operators, rigging crews, and FairWind technicians ensured the safe and efficient completion of the job.

Seguir leyendo aquí o Contacto for main component exchange services.

Más casos prácticos

El equipo de FairWind instala un aerogenerador de Siemens Gamesa en el parque eólico de Niinimäki (Finlandia)
Instalación en tierra de 22 turbinas SG
Técnicos de FairWind reparan palas de aerogeneradores marinos en el marco de una operación de mantenimiento de energías renovables.
Reparación de palas estructurales en alta mar
Explotación de aerogeneradores en el parque eólico norteamericano Silver Star, con el apoyo de FairWind.
Mantenimiento y revisión de los sistemas de elevación Avanti
es_ESES