Description

FairWind’s Main Component Exchange (MCE) team successfully completed a main bearing replacement on a wind turbine in the United States.

This comprehensive project involved the full disassembly of the existing drivetrain, including the removal of the hub and blades.

Results
  • Despite weather challenges, the project was delivered on schedule.

  • The turbine was reassembled and tested within the allotted time frame.

  • The main bearing replacement extended the turbine’s life, reducing the need for new equipment production and transportation, and minimising environmental impact.

  • Coordinated efforts between crane operators, rigging crews, and FairWind technicians ensured the safe and efficient completion of the job.

Read more here or contact us for main component exchange services.

More case studies

FairWind team installing a Siemens Gamesa wind turbine at the Niinimäki wind farm in Finland
Onshore installation of 22 SG turbines
FairWind technicians performing offshore wind turbine blade repair as part of a renewable energy maintenance operation
Offshore structural blade repair
Wind turbine operations at the Silver Star Wind Farm in North America, supported by FairWind
Maintenance and overhaul of Avanti lift systems
en_GBEN