Description

The Borssele TPs project involved the
electrical installation of 59 TPs for the
Borssele 1+2 offshore wind farm. These
TPs were assembled in Aalborg, Denmark
and installed offshore in the Dutch Sea.

The electrical work included the full
installation for integration into the
wind farm’s electrical grid, including
mounting circuit breakers, the installation
and wiring of lighting systems, cabling
throughout each TP, installing high
voltage switchgear units with liquid air
for insulation and all other electrical
components.
 
Read more here or contact us for electrical and HV services.
 

More case studies

Rotor on stand with banana beam at a North American wind farm for an MCE wind turbine replacement project
Replacing main bearings in storm season
FairWind team installing a Siemens Gamesa wind turbine at the Niinimäki wind farm in Finland
Onshore installation of 22 SG turbines
FairWind technicians performing offshore wind turbine blade repair as part of a renewable energy maintenance operation
Offshore structural blade repair
en_GBEN