Description

FairWind took on the Installation of 22 Siemens Gamesa
6.6-170 T165 turbines, each with eight tower sections, at the Niinimäki wind farm in Finland.

This included the pre-assembly to final installation of the wind turbines, within a timeframe of six months. The project took place in two shift operations for installation and one shift for internal finishing.

 

Results

  • Efficient execution of the pre-assembly and installation process
  • Maintained safety and quality standards throughout the project
  • Successfully completed phase one of the installation within the scheduled timeframe.
 